Abciximab in patients with ruptured intracranial aneurysms

…, MC Patel, IR Colquhoun - American journal of …, 2005 - Am Soc Neuroradiology
BACKGROUND AND PURPOSE: Experience with intravenous abciximab to manage
thromboembolism during treatment of ruptured intracranial aneurysms is limited. We present our …

Apparent paradoxical vault changes with middle cranial fossa arachnoid cysts—Implication for aetiology

S Redla, Y Husami, IR Colquhoun - Clinical radiology, 2001 - Elsevier
Three cases of middle cranial fossa arachnoid cyst with paradoxical bone changes in the
adjacent vault are described, namely, a small middle cranial fossa and pneumosinus dilatans. …

Phase I trial of temozolomide using an extended continuous oral schedule

…, SR Wedge, M Bower, H Evans, I Colquhoun… - Cancer research, 1998 - AACR
Temozolomide, a methylating imidazotetrazinone, has antitumor activity against gliomas,
malignant melanoma, and mycosis fungoides and is presently administered as a 5-day oral …

Strain-based models for dent assessment: a review

…, R Krishnamurthy, I Colquhoun - International …, 2008 - asmedigitalcollection.asme.org
The depth-based dent assessment criteria as required by various government regulations
and industry codes have served the pipeline industry well by requiring pipeline operators to …

Rapid Analysis Tool for High-Level Risk Assessment of Pipelines

IR Colquhoun, E Choong… - International …, 2002 - asmedigitalcollection.asme.org
When the benefits of using risk-based decision making in pipeline integrity management
programs have been identified, operators are immediately faced with the challenge of large …

[CITATION][C] The grazing ecology of red deer and blackface sheep in Perthshire, Scotland.

IR Colquhoun - 1971 - cabidigitallibrary.org
Skip the header click to show the menu Menu Cart Login Login/Register Institutional Access
Access Options Enter words / phrases / DOI / ISBN / keywords / authors / etc Search Advanced …

Ensuring consistent factors of safety in the assessment of corroding pipelines

J Dawson, J Hedger, DG Jones, I Colquhoun - NACE CORROSION, 2002 - onepetro.org
Any decision to repair an area of corrosion must include an appropriate safety factor. The
current published guidance on safety factors in pipeline codes1-5 is inconsistent and in some …

A Risk-Based Approach to Maintenance Planning Utilizing in-Line Inspection Data

…, I Colquhoun, R Kania… - International …, 2004 - asmedigitalcollection.asme.org
A common approach to the management of external corrosion in the pipeline industry is to
perform an In-Line Inspection, followed by repairs of defects that fail a deterministic criterion, …

System wide risk-based pipeline integrity program at TransCanada

…, L Fenyvesi, I Colquhoun… - International …, 2000 - asmedigitalcollection.asme.org
TransCanada is meeting the challenges of enhanced pipeline safety and reliability in a
competitive environment by combining new technologies in an innovative way to help manage …

A Framework for Safety-Constrained Integrity Management for Gas Pipelines Using Defined Risk Acceptance Criteria

…, J Keeter, I Colquhoun - International …, 2002 - asmedigitalcollection.asme.org
Risk assessment has been used historically in pipeline integrity to provide relative risk
rankings based on a mixture of qualitative and quantitative inputs. With the improvement of …